Excavator working in a deep retaining structure on a construction site.

Engineering discipline

Construction Engineering & Quantity Surveying

Estimating, quantities, temporary works, site method and the commercial reality of building it.

14 topics in this discipline

Construction & QS Follow a procedure

Temporary works checks before a concrete pour

The checks that matter before concrete is placed, when the formwork is carrying load that will not be there later.

  • Type Checklist
  • Tools 2 linked
  • Review Needs engineering judgement