Construction Engineering Verified Calculator

Fire Water & Egress Calculator

Occupant load, fire water storage from flow × duration (floored at a minimum), duty/standby pump sets, escape stair count and rated fire doors.

Add this calculator to the Construction Workflow

Screening-level estimate. A storage-and-pump screen with an explicit minimum. NOT a code-compliance calculation and NOT an escape or evacuation design.

Workspace

Continue where you left off

Saved calculations in this browser can be reopened with their inputs intact.

Open Workspace

Method — Screening-level estimate

A storage-and-pump screen with an explicit minimum. NOT a code-compliance calculation and NOT an escape or evacuation design.

Every result below is produced by the same engineering engine that feeds the High-Rise reference project, so a quantity taken from this page and a quantity taken from the workflow cannot disagree.

Governing Formula

Governing Formula
P_occ = A_total / density

Where:

  • A = Total protected area [m2]
  • rho = Occupant density [m2/person]

Derived Equations:

Design fire flow: Q = A x flow per m2
Tank, never below the minimum: V = max(minimum, Q x duration / 1000)
Duty plus standby per zone: N_pump = zones x 2

Assumptions & Limitations

  • No escape width, travel distance, exit separation, stair pressurisation or smoke control design.
  • No sprinkler hydraulic calculation - pipe sizing and pump duty curves are out of scope.
  • Rated door count assumes one door per stair per served floor; actual layout depends on the architecture.
Engineering Disclaimer & Verification Notice

This calculator provides preliminary engineering estimates for informational and planning purposes. Actual reverse osmosis / engineering system performance depends on site conditions, feed-water chemistry, membrane characteristics, operating pressure, temperature, recovery limits, fouling/scaling potential, and system design. Verify results using project-specific data, manufacturer projections, and applicable engineering standards before final design or operation.