Stage 2 of 13 / Calculation
Build the load profile
Convert a listed load schedule into daily and annual energy, a diversified peak and a critical-load subset for backup.
- Practitioner
- 13 stages
- 12 min
- Solar PV and electrical storage
After this stage you can
- Enter a load schedule and read daily, annual and critical energy.
- Explain why the diversified peak is lower than the sum of nameplate ratings.
- Decide which loads are critical and defend the autonomy target they imply.
The engineering
The load audit is a ledger: quantity × rated watts × daily hours, with a category template that spreads the load across the day. Refrigeration cycles, motors surge, cooling follows summer and lighting follows winter; the workbench applies those shapes rather than treating every load as a flat block.
The energy total and the peak are different questions. Energy sizes the array and the battery; the coincident, diversified peak sizes the inverter and the backed-up AC load. A schedule with a large energy total but a small peak is a very different design from the reverse.
Mark only the loads that must survive an outage as critical. That subset drives the autonomy requirement, and inflating it silently oversizes the battery. If there is no measured profile, say so in the capstone rather than presenting an estimate as a measurement.
EngiMetric / solar workbench
Your project, computed stage by stage
Loading the saved project state...
Preview screen. Inputs are saved in this browser only. Resource presets and tariffs are illustrative. Failed checks stay visible; a clean summary is not a stamped design.
Inputs and outputs
You own
- Quantity, rated watts and daily hours for each load
- Category and seasonal shape
- Critical flag, deferrable flag and surge factor
- Diversity factor and load growth
You produce
- Daily, annual and critical energy (kWh)
- Coincident diversified peak (kW)
- 24-hour shape and monthly energy/peak table
Your deliverable for this stage
A load schedule with daily energy, diversified peak and a marked critical subset.
Stage assumptions, limits and sources
Assumptions
- Rated watts are running watts for the hours entered.
- Category templates are representative shapes, not measured appliance traces.
- Diversity applies to the coincident peak, not to the energy total.
Constraints
- The schedule is a single typical day repeated across each month.
- Load growth is applied to the annual forecast, not to the hourly shape.
Limitations
- Duty cycles, standby power, low power factor and harmonic currents are not modelled.
- No weekday/weekend or occupancy variation; no measured demand data.
Review status
- Needs engineering review
- Professional review is required before publication or use as a design basis.
Sources
Stage progress is stored in this browser only. The explanation and every limit on this page remain readable with JavaScript disabled; the calculators need it to run.
Stage kind: Calculation / Journey: solar-bess-screening / Stage: load-audit