Stage 5 of 13 / Calculation
Check the electrical design
Check the string voltage window, current, DC and AC voltage drop, breaker selection and bill of materials.
- Practitioner
- 13 stages
- 16 min
- Solar PV and electrical storage
After this stage you can
- Check cold Voc and hot Vmp against the inverter window.
- Compute DC and AC voltage drop and choose a larger cable when needed.
- State the protection and coordination work that this stage does not cover.
The engineering
A string that produces the right energy can still be unbuildable. Cold-weather open-circuit voltage must stay below the inverter and system limit; hot-cell maximum-power voltage must stay above the MPPT minimum. The workbench checks both ends of the temperature range, not just standard test conditions.
Cable sizing is a voltage-drop and ampacity problem. The tool computes resistive drop for the stated length and copper area, compares it with the limit, and suggests the next standard area. Ampacity must still be checked against the installation method and derating factors in the applicable code.
Breakers are selected from standard ratings above the design current. That is a screening selection, not a coordination study. Discrimination, earth-fault protection, DC arc-fault detection, surge protection and labelling remain engineering deliverables outside this model.
EngiMetric / solar workbench
Your project, computed stage by stage
Loading the saved project state...
Preview screen. Inputs are saved in this browser only. Resource presets and tariffs are illustrative. Failed checks stay visible; a clean summary is not a stamped design.
Inputs and outputs
You own
- Module electrical data and temperature coefficients
- Minimum and maximum cell temperature
- MPPT window, maximum system voltage and inverter DC current
- String count, cable lengths, areas and ampacities
- AC voltage, phases, power factor and standard breaker ratings
You produce
- Twelve pass/fail constraint checks
- DC and AC voltage-drop results
- Selected breaker ratings and a screening bill of materials
Your deliverable for this stage
A constraint-check table, cable/drop results and a screening bill of materials with failed checks visible.
Stage assumptions, limits and sources
Assumptions
- Cable resistance is computed from copper resistivity at a single reference temperature.
- Breaker selection uses the stated standard ratings, not a manufacturer catalogue.
- The array is a single orientation feeding one MPPT window.
Constraints
- No protection coordination, fault-current or arc-flash study.
- No installation-method derating, grouping factor or ambient correction for ampacity.
Limitations
- No earthing/grounding design, lightning protection or equipotential bonding.
- No structural, fire, labelling or utility interconnection review.
- A passing screen is not a code compliance certificate.
Review status
- Needs engineering review
- Professional review is required before publication or use as a design basis.