Stage 9 of 14 / Comparison
Compare utilisation, cooling and redundancy scenarios
Re-run the complete model for each option instead of scaling the base case, then compare PUE, peak demand, cost and feasibility.
- Advanced
- 14 stages
- 15 min
- Mission-critical electrical and thermal systems
After this stage you can
- Run complete model re-runs for utilisation, cooling, topology and tariff options.
- Compare peak demand, PUE, CAPEX, OPEX and cost per delivered IT kWh.
- Explain why a lower-cost option may be infeasible against the stated availability target.
The engineering
A scenario is a deliberate change to the saved basis: utilisation, cooling approach, power topology or electricity price. The runner clones the state, applies only that change and re-runs every engine. Nothing is scaled from the base case, so a topology change also recalculates equipment counts and cost.
The comparison is designed to expose trade-offs. Higher utilisation improves cost per delivered IT kWh but reduces headroom. Direct-to-chip cooling may reduce air flow and plant power but changes the facility water boundary. An N topology lowers equipment count and cost but fails the availability target.
Feasibility is a screening flag. A scenario is marked infeasible when the model does not converge, the availability target is missed, or an electrical or cooling check fails. It is not a financial recommendation.
EngiMetric / AI data-center workbench
One project, computed from rack to report
Loading the saved project state...
Preview screen. Inputs are saved in this browser only. Climate, grid, water and cost values are illustrative. Failed checks stay visible; a clean summary is not a stamped design and no Tier rating is claimed.
Your deliverable for this stage
A scenario comparison table with a defended recommendation and rejected options.
Stage assumptions, limits and sources
Assumptions
- Only the declared scenario inputs change; all other basis values stay fixed.
- Topology scenarios trim equipment counts to the recalculated requirement.
- Feasibility is a screening flag, not an investment recommendation.
Constraints
- Deterministic one-at-a-time scenarios, not a probabilistic risk model.
Limitations
- No construction schedule or phased cash-flow timing.
- No financing, tax, incentive or revenue model.
Review status
- Needs engineering review
- Professional review is required before publication or use as a design basis.
Sources
- Uptime Institute - Tier Standard overviewengineering org
- ASHRAE - Data Center Guidance and Datacom Seriesengineering org
- Open Compute Project - Data Center Facility projectengineering org
- NVIDIA - DGX SuperPOD reference architectureofficial docs
- U.S. Department of Energy - Data centers and serversgovernment
Stage progress is stored in this browser only. The explanation and every limit on this page remain readable with JavaScript disabled; the calculators need it to run.
Stage kind: Comparison / Journey: ai-data-center / Stage: energy-profiles