Construction Engineering Verified Calculator

Solar Array Sizing Calculator

Number of photovoltaic modules needed for a daily energy demand from peak sun hours and a system derating factor.

Add this calculator to the Construction Workflow

Geometry-based calculation.Array size from daily energy, peak sun hours and a system derating factor. It ignores shading analysis, array-to-battery voltage window and winter design month.

Module choice changes how many panels you need and how much they actually deliver. Enter the modules you are weighing at the same site and demand and compare the daily production directly.

Solar array capacity and daily energy path A load requiring daily energy, sunlight over a peak-sun-hour window, and a sized array of PV modules whose derated output meets the requirement. Capacity in kilowatts and energy in kilowatt-hours per day are shown separately. ☀PSH PV ARRAY n × W modulesderate % CAPACITY kW ENERGY kWh/d LOAD kWh/dkW is not kWh — sized in capacity, met in daily energy
  • Energy path
  • PV module
  • Rating / annotation
A load requiring daily energy, sunlight over a peak-sun-hour window, and a sized array of PV modules whose derated output meets the requirement. Capacity in kilowatts and energy in kilowatt-hours per day are shown separately. Schematic only — not to scale and not a construction drawing. Peak-sun-hours and derate are user inputs. This is a first sizing step, not a yield simulation, and it is not equivalent to a bankable PV model.

Module options — one row per item

Description Module rating (W) Results per item Remove

Applied to every module option

Workspace

Continue where you left off

Saved calculations in this browser can be reopened with their inputs intact.

Open Workspace

What this calculator does

Once you know how much energy you need each day, the array follows from the sun you actually get. This calculator divides the daily demand by the peak sun hours and a derating factor, then rounds up to a whole number of modules, which is the figure every installer will ask you for.

How to use it

  1. Enter the daily energy demand from the load audit.
  2. Enter the peak sun hours for your site — 4 to 5 in most of Europe, 5 to 6 in North Africa and the Gulf.
  3. Set the derating factor; 14 % is the PVWatts default for a fixed tilted array with soiling, temperature and inverter losses.
  4. The result rounds up to a whole number of modules of the size you entered.

Governing formula

Governing Formula
P_array = E_day / (PSH × (1 − d))

Where:

  • E_day = Daily energy demand [Wh]
  • PSH = Peak sun hours [h/day]
  • d = Derating fraction [–]

Derived Equations:

Whole modules required: n = ⌈P_array / P_module⌉

Worked example — 7.4 kWh a day with 4.5 peak sun hours

The figures below were produced by running this page's own engine with the example inputs (Daily energy demand (Wh), Peak sun hours per day (h), System derating (%), Module rating (W)). If the calculator returns something different for the same numbers, that is a bug, not a rounding difference.

Expected results for the worked example
Array size2000 W
Number of modules5 no
Expected daily production7740 Wh
Unrounded array size1912 W
Assessment5 × 400 W panels (2.0 kW array) produce ≈ 7.74 kWh/day in 4.5 peak-sun-hour conditions.
  1. After derating, each 400 W module yields about 1,548 Wh a day.
  2. 7,400 / 1,548 needs 4.78 modules, so 5 modules are needed.
  3. The rounded 2,000 W array produces about 3,096 Wh a day.

Assumptions & limitations

Engineering calculation. Array size from daily energy, peak sun hours and a system derating factor. It ignores shading analysis, array-to-battery voltage window and winter design month.

  • No shading assessment — even partial shading can cost 30 % or more and must be checked with a shading analysis.
  • No winter design month, so a system sized on annual average may not meet demand in December.
  • Assumes batteries carry the difference between generation and load; without storage the array must meet the daytime load directly.

This tool supports professional engineering work; it does not replace a sealed design. Confirm every result against the applicable standard and a licensed engineer before it is built.

Schedule mode — module options

Module choice changes how many panels you need and how much they actually deliver. Enter the modules you are weighing at the same site and demand and compare the daily production directly.

The schedule totals are the sum of every item's own engine result, so they match running this calculator once per item. An item the engine rejects is reported in place and contributes nothing to the totals.

  • Options are compared only at the peak-sun-hours value entered above. A site with seasonal variation is not represented by a single figure.
  • A larger array is not automatically better: the extra production may exceed the load and be curtailed or exported at a value this tool does not assess.

References & standards

  • NREL PVWatts Calculator — system loss assumptions.
  • Global Solar Atlas — peak sun hours by location.
Engineering Disclaimer & Verification Notice

This calculator provides preliminary engineering estimates for informational and planning purposes. Actual reverse osmosis / engineering system performance depends on site conditions, feed-water chemistry, membrane characteristics, operating pressure, temperature, recovery limits, fouling/scaling potential, and system design. Verify results using project-specific data, manufacturer projections, and applicable engineering standards before final design or operation.