Stage 6 of 15 / Calculation
Balance renewable and grid electricity
Match annual plant energy to renewable generation and grid import without confusing energy with peak power.
- Advanced
- 15 stages
- 14 min
- Process and energy systems
After this stage you can
- Report annual renewable, import, surplus and curtailment.
- Check peak plant demand against renewable capacity plus grid limit.
- Keep emissions as operational grid imports only.
The engineering
Annual renewable energy is capacity × 8,760 h × capacity factor. Any demand above that is imported if a grid connection exists. Surplus is exported only when allowed; otherwise it is curtailed. This is an annual energy screen, not an hourly dispatch.
Peak adequacy is separate. A plant can have enough annual energy and still be short at the coincident peak if renewable capacity plus the grid import limit is below plant kW.
A green-product claim depends on the contractual and temporal matching basis, which this model does not prove. Grid status of unknown is treated as no permitted import.
EngiMetric / green hydrogen educational workbench
Green Hydrogen Plant — Educational Screening Workbench
Loading the hydrogen project state...
Draft development workbench (noindex). Inputs are saved in this browser only. Calculations shown are screening/educational outputs from the existing model where implemented; missing or unsupported quantitative areas remain explicit. Completing stages records self-declared learning progress only — it is not quantitative engineering capability, not an OEM guarantee, and not industrial/project approval.
Stage
Inputs
Edit the screening inputs for this stage, then calculate. Values you enter are marked as user-entered in the local project state; defaults remain illustrative until replaced.
Screening results
Results come from the existing hydrogen screening model. Unsupported quantitative areas, missing evidence, and review requirements remain explicit; outputs are not certified design or approval decisions.
Process & balance context
This educational workbench presents stage-specific calculated outputs and limitations. Detailed interactive diagrams are not required for journey completion; use the stage results and assumptions panels to review boundaries, flows, energy, storage, and economics context.
Assumptions, limitations & review
Your deliverable for this stage
An annual electricity balance with a peak-adequacy check.
Stage assumptions, limits and sources
Assumptions
- Renewable output is a single annual capacity factor.
- Export earns no credit in LCOH.
Constraints
- Unknown grid status means no import in the energy balance.
Limitations
- No hourly matching, storage dispatch or time-of-use tariff.
- Grid kW is not an interconnection study.
Review status
- Needs engineering review
- Professional review is required before publication or use as a design basis.
Sources
- CIAAW - Standard Atomic Weightsstandards
- NIST Chemistry WebBook - Hydrogengovernment
- U.S. Department of Energy - Hydrogen Production: Electrolysisgovernment
- IEA - Global Hydrogen Review 2024, Hydrogen productionresearch institution
- IRENA - Electrolyser costsengineering org
Stage progress is stored in this browser only. The explanation and every limit on this page remain readable with JavaScript disabled; the calculators need it to run.
Stage kind: Calculation / Journey: green-hydrogen / Stage: electricity