Construction Project Workflow

One project, one building definition, one set of quantities. This guide follows an engineer from an empty project to a priced report, and is explicit about what the workflow does not calculate.

1. Start the project, not a calculation

A project is a building being designed. Calculations are tools you reach later, from the stage that needs them — so Start your project asks only for a name and whatever identity you have to hand. You can save with nothing but a name and fill the rest as information arrives.

Fields you leave empty are recorded as not recorded. That is different from “zero” and different from “does not apply”, and the workspace keeps them apart rather than guessing.

2. Define components progressively

The building definition answers what kind of building is this. Components answer what is actually in it, and they arrive stage by stage — a basement, then its footings, then the slabs and beams above.

  • Basement — Overall basement extents and depth below datum.
  • Floor — One floor plate. Area can come from the floor record or be entered here.
  • Roof — Roof slab or deck area and build-up thickness.
  • Core / shear walls — Lift and stair cores as repeated vertical elements.
  • Foundation type — The foundation solution as designed. Capacity checks still need the soil report.
  • Footing / pad — One pad, or a repeated pad type with a count.
  • Pile — Pile diameter and length from the geotechnical design.
  • Slab — Slab extents and thickness. Thickness drives volume and formwork.
  • Beam — Beam size and span as designed.
  • Column — Column size, height and storey count.
  • Wall — Wall length, height and thickness. Partitions, core walls and retaining walls are distinct designs — record which.
  • Stair / stair core — Flight geometry and number of flights.
  • Opening — Doors and windows, used to deduct from envelope areas.
  • Service run — Buried service run: trench length, width and depth.

Only the dimensions that kind needs are requested. A component you have measured but not sized stays explicitly “no dimensions recorded”, and no volume is derived from an unmeasured input.

3. Work the lifecycle

The registry has 21 stages in five phases. Guided mode walks them in order and warns about unmet prerequisites; Expert mode opens any stage directly. Neither mode locks you out of a stage — a warning is advisory, because you may legitimately need to work a stage out of order.

Current capability: 4 supported, 17 partially supported, 0 not available yet. A stage is never marked complete because you opened it.

Definition & Early Works

  • 01. Project Setup and Site Information — Supported. Limitation: No dedicated site-information calculator; site data is entered as free text.
  • 02. Site Preparation, Survey and Earthworks — Partially supported. Limitation: No survey import or setting-out model; levels are entered manually.
  • 03. Foundations — Partially supported. Limitation: Soil properties are user-supplied; the repository holds no soil database and will not invent one.
  • 04. Below-Ground Structural Works — Partially supported. Limitation: No dedicated waterproofing area or membrane takeoff calculator (see stage 07).
  • 05. Above-Ground Structural Frame — Partially supported. Limitation: No automatic reinforcement percentage rule. Bar schedules must be supplied by the engineer; a percentage would be a fabricated design parameter.

Envelope & Internal Construction

  • 06. Masonry and Partitions — Supported. Limitation: No block layout generator or mortar mix design tied to the block type.
  • 07. Waterproofing and Protection — Partially supported. Limitation: Material quantity stays unresolved until the engineer enters the coverage rate published for the selected product. No rate database exists and none is invented.
  • 08. Facades and Building Envelope — Partially supported. Limitation: No curtain-wall or cladding engineering (anchors, brackets, deflection).
  • 09. Interior Finishes — Partially supported. Limitation: No finish schedule import; areas are entered by hand.
  • 10. Metalwork, Joinery and Fixtures — Partially supported. Limitation: This is a QUANTITY SCHEDULE. It does not establish a manufacturing specification, a bill of materials, hardware, finishes or fire rating.

Building Services & External Works

  • 11. Electrical and Low-Current Systems — Partially supported. Limitation: No short-circuit study, protection coordination or arc-flash assessment.
  • 12. Mechanical and Plumbing Systems — Partially supported. Limitation: No pipework layout or coordinated services model.
  • 13. Fire Protection and Life Safety — Partially supported. Limitation: No smoke control, sprinkler hydraulic design or detector layout.
  • 14. External Works and Utilities — Partially supported. Limitation: No utility coordination model; buried services are entered manually.

Commercial & Project Controls

  • 15. Final Quantity Takeoff and BOQ — Supported.
  • 16. Cost Planning and Rate Analysis — Supported. Limitation: Rates are user-provided. The repository holds no market price database and will not fabricate one.
  • 17. Construction Scheduling and Resource Planning — Partially supported. Limitation: No critical-path or resource-levelling engine; the schedule is a derived list, not a full CPM solver.
  • 18. Procurement and Material Planning — Partially supported. Limitation: No supplier, vendor, market-price or lead-time database exists, and none is invented. Supplier, quotation and required-date fields stay unknown until the engineer enters them.

Completion & Handover

  • 19. Inspection, Testing and Commissioning — Partially supported. Limitation: No document-control workflow or digital signature capture.
  • 20. Handover, Defects and Closeout — Partially supported. Limitation: No document management or as-built drawing store.
  • 21. Final Project Report and Archive — Partially supported. Limitation: Export is JSON, CSV and browser print-to-PDF; runtime XLSX export is deferred in the existing code.

4. Use calculators as contextual tools

Each component lists the calculators that actually apply to it. Where a component dimension and a calculator input are the same physical quantity in the same unit, the value carries across automatically.

Where they are not, the tool opens empty. A millimetre slab thickness is not the same quantity as a metre member depth, and EngiMetric will not push one into the other just because the boxes line up.

Opening a calculator never adds a quantity. Nothing reaches the bill of quantities until a result is reviewed and explicitly transferred.

5. Move quantities into the bill of quantities

  1. Run the calculator and read the result, including anything it reports as unresolved.
  2. Raise a quantity transfer against the component or stage.
  3. Review it: provenance, unit, and the BOQ section it will land in.
  4. Approve. Only then is the quantity consolidated into the project's bundle.

If the bill of quantities already holds a different quantity for that source, the transfer is refused, not applied over the top. If you have edited that BOQ line by hand, it stays untouched. Conflicts are surfaced for you to resolve.

6. Apply rates, and read the result honestly

Rates are yours. EngiMetric holds no market price database and will not supply one, so a line with no rate is shown as unpriced rather than as zero. Two modes exist: a single rate, or a rate analysis broken into material, labour, equipment and other. An incomplete analysis never silently falls back to a single rate.

A partially priced bill of quantities is reported as a known cost with a count of priced and unpriced lines. It is never presented as a project total.

7. Procurement

Once quantities exist, the procurement register derives one package per BOQ line, carrying the provenance of where each quantity came from. You record supplier, quotation reference, quoted amount, required date and status yourself. There is no supplier database, no market price and no lead-time data, so those fields stay unknown until you enter them — and a quotation comparison needs two real quotations before it can exist.

8. Produce the report

The construction report is generated from the authoritative project and bundle data: quantities, BOQ, rates, cost summary, incomplete and review items, and the engineering provenance behind each quantity. Export is JSON, CSV and browser print-to-PDF; runtime XLSX export is deferred.

What this workflow does not calculate

  • No automatic reinforcement percentages. Bar schedules must come from your design; a percentage would be an invented design parameter.
  • No soil database, supplier database, market prices or lead times.
  • No structural design, connection design or code-compliance certification.
  • No product selection for waterproofing, membranes, joinery or metalwork.
  • No CPM solver: durations are engineer-supplied, and no productivity factor is assumed.
Engineering Disclaimer & Verification Notice

This calculator provides preliminary engineering estimates for informational and planning purposes. Actual reverse osmosis / engineering system performance depends on site conditions, feed-water chemistry, membrane characteristics, operating pressure, temperature, recovery limits, fouling/scaling potential, and system design. Verify results using project-specific data, manufacturer projections, and applicable engineering standards before final design or operation.