EngiMetric Arena / Engineering Trade-off

Choose a pond depth that fits the land and the approval limit

  • Engineering Trade-off
  • Environmental
  • advanced
Competency Constraints and trade-offs primary Design and sizing supporting

What you should take away: Relate storage volume, pond depth and footprint, and choose a depth that satisfies both a land limit and a depth limit.

The situation

What is happening

A detention basin must store 1 757 m3 from the design storm. The available site allows a maximum pond footprint of 900 m2, and the approval limits the pond depth to 2.8 m. Choose a depth from 1.5, 2.0, 2.5 or 3.0 m.

Given

Scenario values with units
QuantityValueUnitNote
Required storage 1 757 m3 From the design storm.
Maximum footprint 900 m2 Available site area.
Maximum depth 2.8 m Approval limit.
Candidate depths 1.5 / 2.0 / 2.5 / 3.0 m Discrete design options.

Assumptions this challenge makes

  • The pond has vertical sides, so footprint is storage volume divided by depth.
  • The required storage is fixed by the inflow and permitted release.
  • Freeboard, side slopes and sediment storage are not included.

Limits this decision must satisfy

Project limits the submitted value must satisfy
Limit Requirement If it is breached
Pond footprint not more than 900 m2 Above the site limit the basin does not fit the available land and needs a different layout or release rate.
Pond depth not more than 2.8 m Above the approval limit the basin needs a geotechnical, safety and permitting review that this project does not have.

Choose 1.5, 2.0, 2.5 or 3.0 m. More than one depth may satisfy both limits.

Your call

Your answer

Choose 1.5, 2.0, 2.5 or 3.0 m. More than one depth may satisfy both limits.

What this challenge does not establish

  • The pond is treated as vertical-sided; actual side slopes, freeboard and sediment storage change the footprint.
  • The storage volume is a single-storm screening result, not a routed hydrograph.
  • The 900 m2 and 2.8 m limits are project assumptions, not universal criteria.
  • Geotechnical stability, groundwater, outlet control and emergency spillway design are not assessed.