What you should take away: Evaluate battery autonomy against a minimum resilience requirement and a maximum bank size, recognising that a band of autonomy values can comply.

The situation

What is happening

An off-grid load uses 4.8 kWh/day at 48 V and 80 % depth of discharge. The project requires at least two days of autonomy, but the battery room limits the nameplate bank to 20 kWh. Choose an autonomy of 1, 2, 3 or 4 days.

Given

Scenario values with units
QuantityValueUnitNote
Daily energy 4.8 kWh/day Load energy per day.
System voltage 48 V Nominal DC bus.
Depth of discharge 80 % Usable fraction of nameplate.
Minimum autonomy 2 days Project resilience requirement.
Maximum bank energy 20 kWh Battery room limit.

Assumptions this challenge makes

  • The load is constant at 4.8 kWh/day.
  • Nameplate bank energy is daily energy times autonomy divided by depth of discharge.
  • Temperature, ageing and inverter efficiency are not included.

Limits this decision must satisfy

Project limits the submitted value must satisfy
Limit Requirement If it is breached
Minimum autonomy not less than 2 days Below two days the site has less resilience than the project requires during cloudy or high-load periods.
Maximum bank energy not more than 20000 Wh Above 20 kWh the bank does not fit the available battery room and adds cost without a stated resilience need.

Choose 1, 2, 3 or 4 days. More than one autonomy may satisfy both the resilience and bank-size limits.

Your call

Your answer

Choose 1, 2, 3 or 4 days. More than one autonomy may satisfy both the resilience and bank-size limits.

What this challenge does not establish

  • The load is constant; a real load profile and inverter efficiency change the bank size.
  • Temperature, ageing and Peukert losses are not modelled.
  • The 20 kWh limit is a project room constraint, not a battery performance limit.