Operation Seawater reverse osmosis

Taweelah RO IWP (Al Taweelah Independent Water Plant)

Taweelah, Abu Dhabi · United Arab Emirates

The Al Taweelah IWP is, at design capacity, the largest seawater reverse osmosis plant in operation, producing up to 909,200 m³/day for Abu Dhabi under a 30-year agreement with EWEC. Construction was phased: the first block reached operations in mid-2022 and full commercial operation was certified in March 2024.

Design Capacity
909,200 m³/day (200 MIGD)
Project Value
USD 874 million
Status
Operation
Announced
2019
Expected Completion
2024
Client / Offtaker
Emirates Water and Electricity Company (EWEC) — 30-year water purchase contract
Technology
Seawater reverse osmosis (SWRO) with on-site solar PV
Country
United Arab Emirates
Region
Taweelah, Abu Dhabi
Last Verified
2024-03-18

Why This Project Matters

Al Taweelah is a landmark for SWRO at utility scale. It demonstrates that membrane desalination can economically replace thermal distillation as the default bulk-water mode in the Gulf, and pairs the process with a 70 MWp captive solar array so desalinated water can be produced with a substantially lower carbon footprint than legacy thermal plants.

Timeline

  1. Water purchase agreement signed

    EWEC and the project company sign a 30-year water purchase agreement for the plant.

  2. First phase in operation

    First block reaches 454,600 m³/day (50% of design capacity), connected to the Abu Dhabi network.

  3. Full commercial operation

    Final phase certified; the facility reaches 909,200 m³/day, becoming the world’s largest operating RO plant.

Verification & Sources

EngiMetric tracks project facts against public sources only. Every value above (capacity, value, parties, status, dates) is cited. Content last verified on 2024-03-18.