Construction Engineering Verified Calculator

Joinery & Metalwork Schedule Calculator

Quantity takeoff for doors, windows, handrails, balustrades and metal frames: counts, gross areas and linear metres from your own schedules.

Joinery & Metalwork Schedule

A quantity takeoff for doors, windows, handrails, balustrades and metal frames: how many, and how much area or length. It is not a manufacturing specification, a bill of materials, or a structural check.

Doors & windows
Metalwork
Items counted
—
each
Measured area
—
m² gross
Linear length
—
m

Schedule

    This is a quantity schedule. It does not establish a manufacturing specification, a bill of materials, hardware, finishes, or the structural adequacy of a handrail or frame. Those remain design and fabrication decisions.

    Workspace

    Continue where you left off

    Saved calculations in this browser can be reopened with their inputs intact.

    Open Workspace

    Governing Method

    Counts and gross geometric areas taken from the project's own schedules. Area is A = W × H per unit; balustrade face area is run length × height.

    Governing Formula
    A = n × W × H ; A_rail = L × H

    Where:

    • n = Count of units from the schedule [each]
    • W = Unit width [m]
    • H = Unit height [m]
    • L = Measured run length [m]

    Derived Equations:

    Face or opening area: A = n × W × H
    Balustrade face area: A_rail = L × H
    Metal frame length: L_frame = n × L_frame_each

    What this is, and what it is not

    This is a quantity schedule / takeoff worksheet. It answers “how many, and how much area or length”, which is what a BOQ line needs. It does not establish:

    • a manufacturing specification or a bill of materials,
    • structural adequacy of a handrail, balustrade, frame or support,
    • hardware, locking, finishes, glazing performance or fire rating,
    • any product selection.

    Those remain the fabricator's and designer's responsibility.

    Worked Example (illustrative figures)

    1. Doors: 240 units at 0.9 × 2.1 m → 240 × 0.9 × 2.1 = 453.6 m²
    2. Windows: 900 units at 1.5 × 1.2 m → 900 × 1.5 × 1.2 = 1,620 m²
    3. Balustrade: 480 m run at 1.1 m → 528 m² face area, and 480 m linear

    Items counted: 1,140. Measured area: 2,601.6 m². Linear: 480 m.

    Assumptions & Limitations

    • Counts and sizes are taken exactly as entered from your schedules; EngiMetric does not check them against a drawing.
    • Areas are gross; no deduction for glazing, frames or openings is applied.
    • No wastage, offcut or cutting allowance is added — add it explicitly if your practice requires one.
    • Implausible sizes (a door 50 mm wide, a leaf 100 mm high) are rejected rather than reported.
    • Where a count exists but no size, the area is reported as unresolved rather than as zero.

    Frequently Asked Questions

    Is this a door schedule?

    No. It is a quantity takeoff: it counts and measures. A real door schedule carries fire rating, glazing, hardware, finish, frame type and reference — none of which are inferred here.

    Why does my area say "Unresolved"?

    Because you supplied a count without a size. The count is valid, but area needs two dimensions. Supply the width and height and the area resolves.

    Does it check the handrail is structurally adequate?

    No. It gives you the run length and face area for pricing. Balustrade structural adequacy is a design check against the applicable code and is not performed here.

    Engineering Disclaimer

    Engineering Note: Quantity takeoff only. This tool does not produce a manufacturing specification, a bill of materials, or a structural design, and must not be used as one.

    Technical References

    • Counts and dimensions must come from the project door, window, railing and metalwork schedules.
    • Fire rating and escape requirements for doors are defined by the applicable building code and must be specified separately.
    Engineering Disclaimer & Verification Notice

    This calculator provides preliminary engineering estimates for informational and planning purposes. Actual reverse osmosis / engineering system performance depends on site conditions, feed-water chemistry, membrane characteristics, operating pressure, temperature, recovery limits, fouling/scaling potential, and system design. Verify results using project-specific data, manufacturer projections, and applicable engineering standards before final design or operation.