How much settlement is acceptable, and which kind governs
Distinguishing immediate from consolidation settlement, and why the damage limit is usually about differential movement rather than total.
The engineering question
A footing can be well within its bearing capacity and still damage the building. How much movement is acceptable, and which calculation predicts it?
Worked example
The figures below were produced by running the Foundation Settlement Calculator with the same inputs — during the build, from its authoritative engine.
| Total settlement | 409.952 mm |
|---|---|
| Immediate (elastic) settlement | 12.012 mm |
| Consolidation settlement | 397.94 mm |
| Stress increase at layer mid-depth | 90 kPa |
| Assessment | Immediate 12 mm + consolidation 398 mm ≈ 410 mm for a 6 m compressible layer. Bearing-pressure stress at layer mid-depth 90 kPa. |
- Immediate settlement is an elastic response: q·B(1−ν²)·If/E.
- Consolidation uses the compression index over the thickness of the compressible layer and the stress increase at its mid-depth.
- Total movement is the sum. Reinforced concrete frames typically tolerate about 25 mm total but far less differentially.
Sanity check
If consolidation is reported as zero on a soft clay, the void ratio or the compression index has almost certainly been left at a default.
Tools for this problem
These are the EngiMetric calculators that compute the numbers in this topic. Each one shows its formula, its units and its limits rather than returning a bare result.
Engineering review required
This topic supports professional engineering work; it does not replace a sealed design. The result depends on site data, the governing standard and engineering judgement, and should be confirmed by a competent engineer before it is built.
References & standards
- BS EN 1997-1 — serviceability limit states
- Terzaghi, Peck & Mesri — Soil Mechanics in Engineering Practice
Related problems
What the ground under your foundation can actually carry
How to go from a soil description to an allowable bearing pressure, and how to tell whether bearing or settlement will actually govern your footing.
Also: Civil & Structural
How much load can a pile take, and which part is doing the work
Splitting pile capacity into shaft friction and end bearing so you can tell whether a longer pile actually helps.